This project will repair, restore, waterproof, pressure wash and restripe the existing pavement markings of the three level parking ramp located adjacent to the Passenger Terminal. Missing specification sections will be added via Addendum.Addendum No. 1 added on 04/24/12.Addendum No. 2 added on 04/30/12.Addendum No. 3 added on 05/01/12.